Extension to Woodston Primary School

Posted on: 23rd of February 2022

Drainage design and detailing. External works – car park extension. Steelwork design for extension and modifications to existing building. Foundation design and detailing.
Duties undertaken by Stirling Maynard included:

  •  Evaluation of design options and input into Value Engineering exercises.
  • Detailed Civil and Structural Engineering design and specification services including:
  • Foundations, ground bearing slabs and suspended slabs.
  • Structural steel framing.
  • Structural remodelling of administration/ teaching areas.
  • Below-ground foul and surface water drainage.
  • External paved areas and sports pitches.