Extension to Woodston Primary School
Posted on: 23rd of February 2022
Drainage design and detailing. External works – car park extension. Steelwork design for extension and modifications to existing building. Foundation design and detailing.
Duties undertaken by Stirling Maynard included:
- Evaluation of design options and input into Value Engineering exercises.
- Detailed Civil and Structural Engineering design and specification services including:
- Foundations, ground bearing slabs and suspended slabs.
- Structural steel framing.
- Structural remodelling of administration/ teaching areas.
- Below-ground foul and surface water drainage.
- External paved areas and sports pitches.