Greencore Prepared Meals, Warrington

Posted on: 4th of March 2022

Construction on this Major Development, implemented our team’s civil and structural design, which re-imagines the inner workings and external features of the site to ensure the facility is fit for the future.

Radical alteration and extension work was undertaken to enhance staff welfare and assist with increased production rates and warehousing capacity.
The complexity of the project from the co-ordination of the existing and new drainage systems, which extend under the new piled structures, through to the schemes 70m long pedestrian footbridge made for a challenging project.