IBA Plant Cleveland
Posted on: 4th of March 2022
Site floods during heavy rainfall due to no outlet from the surface water lagoon. Due to the manufacture process lots of debris ends up in the lagoon. We were tasked with looking at the best way to alleviate the flood risk on the site whilst achieving good water quality through a filtration system prior to the surface water leaving the site.