Tulip Foods, Ruskington

Posted on: 4th of March 2022

Construction of a 114m x 14.8m extension to the existing factory plus upgrading and extension to the sites Energy Centre. To link the new ammonia lines to the main factory extension service runs were required that ran through the existing structure involving route planning and existing structure assessments under increased loading. Duties undertaken by Stirling Maynard included:

  • Structural Concept Design
  • Detailed Building Superstructure Design
  • Foundation Design
  • Underground Drainage Design
  • Auto Track Modelling
  • Flood Risk Assessment